OFFICE OF THE

SUPERINTENDING ENGINEER

M.P.P.KV.V. CO. LTD Satai Road, Chhatarpur

Construction of new 33/11 KV Substation alongwith its associate 33KV and 11KV line

  1. Supply, Installation, Testing & Commisioning Of 2 X 5Mva, 33 / 11Kv S / S 2 Nos.Including Civil Work, At Dhadari & Hatwaha  a) 33 KV line : 11.82 KM b) 11 KV line : 3.90 KM
  2. Supply, Installation, Testing & Commisioning Of 3 X 3.15Mva, 33 / 11Kv S / S 3Nos, Including Civil Work, At Lugasi, Vikrampur & Darguwah  c) 33 KV Line : 51.90 KM d) 11 KV Line 7.20 KM
Price
Rs. 725,550,76
Project End Date
20-03-2009
Project Start Date
16-05-2007
Project Completed
13-05-2009
OFFICE OF THE

DY. Chief Electrical Engineer

Construction Office Complex, Habibganj, Bhopal

Modification/shifting of over head 33kv Powerline crossing by providing under ground HT XLPE cable between Tikamgarh-Chhatarpur Section of new B.G.Line

  1. 33KV 300 Sqmmx3 Core HT XIpe cable laying : 830 mtr
  2. 2.11KV 185 Sqmmx3 Core HT Xlpe cable laying : 1818 mt                                                                      Total 2648 mtr 1. Jointing Kit 33KV : 15 Nos. 2. Jointing Kit 11KV : 32 Nos.
Price
Rs. 435,0557
Project End Date
20-12-2008
Project Start Date
06-06-2008
Project Completed
17-05-2013
OFFICE OF THE

DY. Chief Electrical Engineer

Opp. Divisional Training Centre, Khajanchi Bagh East Rly.Colony, Bhopal

Power Supply arrangement by separate 11kV feeder from MPSEB substation to Chhanera Railway station alongwith one VCB of Bhopal Division of WC Railway.

Extensionof 11 KV line on H-beam 152×152 mm 37-1 kg/Mtr. 11 mtrs long with AAAC Rabbit conductor as per Railway technical data . Supply & fixing of 11KV feeder control VCB, 200A with CT’s.

Price
Rs. 987,736
Project End Date
25-01-2019
Project Start Date
20-06-2008
Project Completed
25-01-2019
OFFICE OF THE

Dy. Chief Electrical Engineer

Construction Office Complex, Habibganj, Bhopal

Modification/shifting of over head 33kv Power Line crossing by providing underground HT XLPE cable between Tikamgarh-Chhatarpur Section of new B.G.Line.

  1. 1.11KV 185 SammX3 Core HT Xlpe cable laying : 5374 mtr.
  2. 2.33KV 300 Sommx3 Core HT Yipe Cable Laying : 1764 m

Total 7438 mtr 1. Jointing Kit 11KV : 44 Nos 2. Jointing Kit 33KV : 18 Nos.

Price
Rs. 5332,098
Project End Date
20-12-2010
Project Start Date
17-07-2008
Project Completed
17-05-2013
OFFICE OF THE

SUPERINTENDING ENGINEER

(Construction) Opp. Divisional Training Centre, Khajanchi Bagh East Railway Colony, Bhopal

Replacement of Overhead Power Line (ACSR Conductor) at Harda, Bina & Guna Station of Bhopal division of WC Railway.

Replacement of Overhead Power Line (ACSR Conductor) at Harda, Bina & Guna Station of Bhopal division of WC Railway.

Price
Rs. 113,0045
Project End Date
12-06-2019
Project Start Date
12-12-2008
Project Completed
12-06-2019
OFFICE OF THE

Dy. Chief Electrical Engineer

(Construction) Opp. Divisional Training Centre, Khajanchi Bagh East Railway Colony, Bhopal

Supply , errection, commission of provision of Auxiliary Transformer in Connection with Interlocking of L.C Gates for Automatic Block Signalling and Power Lifting Barriers at Different L.C Gates Over Bhopal Division.

Price
Rs. 613,1615
Project End Date
30-03-2010
Project Start Date
01-09-2009
Project Completed
30-03-2010
OFFICE OF THE

SUPERINTENDING ENGINEER

M.P.P.KV.V. CO. LTD Satai Road, Chhatarpur

Modification to OHE in connection with Construction of additional platforms no.6&7 at Itarsi station of Bhopal division

Modification to OHE in connection with Construction of additional platforms no.6&7 at Itarsi station of Bhopal division

Price
Rs. 323,4234
Project End Date
10-05-2010
Project Start Date
10-11-2009
Project Completed
10-05-2010
OFFICE OF THE

ADDL. General Manager

MPMKVV CO.LTD. Bhopal

Turnkey basis the work of construction of shifting 33KV, 11KV, LT Line & 11 / 0.4KV Distribution Transformers Causing Obstruction in the proposed BRTS Corridor Route for Bhopal City Area from Habibganj underbridge to MPNagar Board Office Square

  1. 33KV line : 4.5 KM
  2. 11KV line : 4.0 KM
  3. LT line : 0.5 KM
  4. Sub Station 11 / 04KV : 7 Nos.
Price
Rs. 10,482,960
Project End Date
15-01-2011
Project Start Date
08-12-2009
Project Completed
18-06-2014
OFFICE OF THE

Chief Electrical Engineer

(Construction) IIIrd-floor, GM Building, Jabalpur

Electrification of staff quarters of Type – 1-72 units at JBP and Type – 1-50 units & Type – III – 6 units at JBP – Sub – Dn Railway stations along with Power supply arrangement at Jabalpur, WCR, JBP – Division.

Electrification of staff quarters of Type – 1-72 units at JBP and Type – 1-50 units & Type – III – 6 units at JBP – Sub – Dn Railway stations along with Power supply arrangement

Price
Rs. 4,064,760
Project End Date
09-06-2010
Project Start Date
10-12-2009
Project Completed
09-06-2010
OFFICE OF THE

Dr. Chief Electrical Engineer

Jabalpur

Provision of 2 x 1000 kVA, 33/11kV substation at Burn complex , Jabalpur

Supply , errection , testing & commissioning of battery and 30V, 2.2V per cell , 100AH capacity lead acid battery with wooden stand duly painted with epoxy paint.

Price
Rs. 50,08,093
Project End Date
16-12-2010
Project Start Date
16-12-2009
Project Completed
16-12-2010
OFFICE OF THE

ADDL. General Manager

MPMKVV CO.LTD.Bhopal

Turnkey basis of complete including laying of 33 KV line (Double Circuit) from newly proposed 100 KVA transformer at 220 KV S / S Chambal and Amrawad Khurd EHV 220 KV S / S for interconnection with existing 33 KV S / S Amrawad, Sidharth Lake City & Ballabh Nagar 33/11 KV S / S Route Length 8.85 Km.

complete including laying of 33 KV line (Double Circuit) from newly proposed 100 KVA transformer at 220 KV S / S Chambal and Amrawad Khurd EHV 220 KV S / S for interconnection with existing 33 KV S / S Amrawad, Sidharth Lake City & Ballabh Nagar 33/11 KV S / S Route Length 8.85 Km.

Price
Rs. 16,530,926
Project End Date
15-06-2011
Project Start Date
20-01-2010
Project Completed
18-06-2014
OFFICE OF THE

Dy. Chief Electrical Engineer

(Construction) Opp. Divisional Training Centre, Khajanchi Bagh East Rly.Colony,Bhopal

Electrification of Station Building, Platform , Circulating Area And Power Supply Arrangements At Ratwas and Hinotiya-Pipalkheda Station In Bina-Guna Section Of Bhopal Division.

Power Supply Arrangement at Ratwas and Hinotia-Pipalkhera Station

Price
Rs. 27,52,216
Project End Date
29-09-2010
Project Start Date
29-03-2010
Project Completed
29-09-2010
OFFICE OF THE

Chief Electrical Engineer

Jabalpur

Provision of Boring earth for 33/11kV Sub station at Burn Complex. Boring earth for 33/11kV Sub station at Burn Complex.

Price
Rs. 172,950
Project End Date
29-05-2011
Project Start Date
29-11-2010
Project Completed
29-05-2011
OFFICE OF THE

Dy. Chief Electrical Engineer

East side of HBJ Rly. Stn. , Construction Office Complex, Habibganj, Bhopal.

Electrification of Station Building, Platform , FOB and power supply arrangement at Malkhedi station of JBP Division.
Power supply arrangement at Malkhedi station of JBP Divn.

Price
Rs. 27,96,289
Project End Date
22-06-2011
Project Start Date
22-12-2010
Project Completed
22-06-2011
OFFICE OF THE

Chief Electrical Engineer

East side of HBJ Rly. Stn. , Construction Office Complex, Habibganj, Bhopal

Improvement to existing HT/LT power supply system at Bhopal & Habibganj on Bhopal Division of West Central Railway.

Improvement to existing HT/LT power supply system at Bhopal & Habibganj on Bhopal Division of West Central Railway

Price
Rs. 58,85,057
Project End Date
12-12-2011
Project Start Date
13-06-2011
Project Completed
12-12-2011
OFFICE OF THE

Dy. Chief Electrical Engineer

East side of HBJ Rly. Stn. , Construction Office Complex, Habibganj, Bhopal

Rewiring of 855 nos. Different types old Railway Staff quarters ( Type-I , II , III, & IV and their equivalent), Cable laying work Over Head line work and provision of 1 no., 500 kVA, 33/0.415 kV Transformer at different stations over Bhopal Division.

Price
Rs. 17,941,434
Project End Date
25-05-2012
Project Start Date
26-07-2011
Project Completed
26-07-2013
MADHYA PRADESH ROAD

DEVELOPMENT CORPORATION LTD

Bhopal

Design , Supply , Erection , Installation , Testing & Commissioning of electrical Work at Network Monitoring Centre Building at Arera Hills,Bhopal.

  •  33kV Sub Station & 33kV line with 2 Nos.1600 KVA Dry Type Indoor Transformer
  •  33kV HT Panel / SF – 6 (2 incomer, 2 outgoing and 1 bus coupler)
  •  DGSet 315kVA
  •  Servo Stablizer 1600KVA
  •  LT Control Main Panel, Control Panel & Bus Duct
  •  Two Six Passenger Lift & One Goods Lifts

Two Six Passenger Lift & One Goods Lifts

Price
Rs. 64,750,531
Project End Date
30-12-2012
Project Start Date
09-01-2012
Project Completed
07-03-2014
McNally

Bharat Engineering Company Limited.

Jabalpur

Supply & Erection, Testing And Commissioning of Electrical items of 6.6KV Overhead Transmission line for BOP Satpura TPS , MPPGCL Project ( BP02)

Supply & Erection, Testing And Commissioning of Electrical items of 6.6KV Overhead Transmission line for BOP Satpura TPS , MPPGCL Project ( BP02)

Price
Rs. 12,555,550
Project End Date
27-01-2013
Project Start Date
27-01-2012
Project Completed
27-01-2013
M.P.PACHIM

KHETRA VIDYUT VITARAN CO.LTD.

Dewas, MP

33 KV independent feeder by laying an extension of 4.7 Kms . 33KV Double Circuit Line on 15 Mtrs.long . ” H ” Beam on behalf of M / s John Deere (I ) Ltd. The independent 33KV feeder is emanating from 220KV S / s Bhopal Road , Dewas for New HT Connection of 3900KVA on 33KV Double Circuit Line with digital summation of multiple feeders so as to achieve summated energy Apex metering system for HT Consumer along with laying of 3 core 400 sq.mm. XLPE underground Cable up to a route length of 300 mtrs . of each length . The 33KV Line emanating from M.P.P.T.C.L. 220KV Sub Station Dewas with independent 2 Nos . 33 KV Bay to the premises of John Deere ‘ s Tractor manufacturing plant at Village Khatamba , Dewas ( M.P ) against M.P.P.K.V.V.C.L.Dewas

The independent 33KV feeder is emanating from 220KV S / s Bhopal Road , Dewas for New HT Connection of 3900KVA on 33KV Double Circuit Line with digital summation of multiple feeders so as to achieve summated energy Apex metering system for HT Consumer along with laying of 3 core 400 sq.mm. XLPE underground Cable up to a route length of 300 mtrs . of each length . The 33KV Line emanating from M.P.P.T.C.L. 220KV Sub Station Dewas with independent 2 Nos . 33 KV Bay

Price
Rs. 10,157,994
Project End Date
15-03-2013
Project Start Date
17-01-2013
Project Completed
12-04-2013
OFFICE OF THE

EXECUTIVE ENGINEER (ELECTRICAL)

M.P.HOUSING & INFRASTRUCTURE DEVELOPMENT BOARD,DIVISION ELECTRICAL INDORE (M.P)

External Electrification work at 23.35 Acres Land at Rau Indore

  •  Street Light Pole (Steel Tubular Polo) : 200 Nos.
  • Underground 11kV 3 core 300 sqmm & 240 sqmm Armored (XLPE) Cable : 1.483 KM. & 1.757 KM. resp.
  • Underground LT 3.5 core 300&150 sqmm Armored (XLPE) Cable : 4.802&4.571 KM.resp.
  • Underground LT 4 core 16& 10 sqmm Armored (XLPE) Cable : 4.358 KM.& 2.419 KM.resp.
  • Packed Substation 315kVA & 200KVA copper wound outdoor unit with 2 Isolator + 1 SFU configuration with non walkin type. : 06 Nos. &01 Nos. respectively.
  • Feeder Pillar & earthing arrangements. : 56 Nos
Price
Rs. 35,435,470
Project End Date
29-11-2014
Project Start Date
04-07-2013
Project Completed
26-08-2016